Amanow is in its early phase. No commercial installation is deployed to date. We would rather date our progress than speak in the present tense about what does not yet exist.

Proof of concept · 2026

Not a trial. A research programme.

The first unit is not installed on a client site. It is hosted by a public university, in a programme conducted with the Ministry of National Education, and designed to be run with several of the university's research departments.

That choice is deliberate. A machine tested by its own manufacturer proves very little. A machine instrumented inside a university, measured by people with no commercial interest in the result, produces data a funder can use.

Three research streams
01
Yield under real climate Thermal and energy engineering

How far measured production diverges from nominal capacity, hour by hour and season by season, and how many litres each kilowatt-hour actually returns. This is the number that decides the cost per cubic metre, and it cannot be established anywhere but on site.

02
Water quality over time Analytical chemistry and microbiology

How stable the potability parameters remain between two maintenance visits, and what the remineralisation profile should be for water that starts out close to distilled. A laboratory with its own protocols and its own reagents, not ours.

03
Prediction and anomaly detection Data science and applied mathematics

Building forecasting and drift-detection models from the unit's own history, then testing whether they warn early enough to be useful. Models are only as good as the data behind them, and that data starts here.

Roadmap

What comes next

Five steps, in order, each one conditioning the next. We are on the first. This is updated as each is passed, not rewritten afterwards.

You are here
  1. Step 01 Proof of concept at a public university Under way

    Conducted with the Ministry of National Education. Measures real output, water quality over time and operating load.

    Produces the figures every later step depends on
  2. Step 02 Publication of output and quality results Pending the first season

    Field data from the proof of concept, published with its sources and its dates, including what does not work.

    Turns claims into evidence a funder can cite
  3. Step 03 First deployment sites Open, partners sought

    Priority to isolated institutional sites in eligible zones, currently supplied from outside. We are looking for these sites and for the partners to finance them.

    The only step you can act on today
  4. Step 04 Continental eligibility map In production

    Rebuilt from measured humidity and temperature series rather than the climate proxy the current map uses.

    Decides where the second demonstrator goes
  5. Step 05 Second demonstrator, outside Morocco Under study

    In a zone where the process performs better than it does in Morocco, to measure the gap rather than assume it.

    Opens the continental perimeter
Step 03 is where you come in.

Whether you run a site that could be equipped or a fund that could finance one, that is the step open today.

Discuss a pilot
Our position

The failure of rural water
is not installation.
It is year three.

HandoverYear 1Year 2Year 3Year 5
A manufacturer Contract ends at handover
Amanow where equipment usually stops Contract runs with the service
The market

Around a hundred companies worldwide sell machines built on the same condensation principle, listed by capacity in a catalogue. The machine is the product; what happens next is the buyer's problem.

Our position

What we carry is not a machine but the operation of a service on sites that have no alternative: study, installation, local training, maintenance, and quality control over time.

Why it matters

Equipment standing idle three years later, for lack of local capacity to run it, is the documented failure mode of rural water infrastructure. It is the one we are built to avoid.

A supplier is paid once. An operator is paid for as long as the water flows. That is the whole difference, and it decides everything else.

We are looking for our first deployment sites.

And for the partners to finance them.